Bank soal

ieltswrites

Cambridge IELTS 16 Test 3 Writing Task 1: Redevelopment Bandara

Cambridge IELTS 16 · Test 3 · Academic Writing Task 1Peta / denah

Dua denah memperlihatkan Southwest Airport seperti sekarang dan seperti yang akan tampil setelah redevelopment tahun depan. Kamu membandingkan gedung terminal, yang dibagi sisi keberangkatan dan kedatangan, serta dermaga gate, beserta fasilitas di setiap area.

Soal

You should spend about 20 minutes on this task. The plans below show the site of an airport now and how it will look after redevelopment next year. Summarize the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

Grafik Cambridge IELTS 16 Test 3 Writing Task 1: Dua denah memperlihatkan Southwest Airport seperti sekarang dan seperti yang akan tampil setelah redevelopment tahun depan. Kamu membandingkan gedung terminal, yang dibagi sisi keberangkatan dan kedatangan, serta dermaga gate, beserta fasilitas di setiap area.

Gratis dan dengan batas waktu, lengkap dengan penghitung kata langsung, seperti ujian berbasis komputer. Setelah itu, dapatkan skor band dari AI.

Buka di komputermu

Simulator ujian membutuhkan layar laptop atau desktop. Kirim tautan ini ke dirimu sendiri dan buka di sana.

Poin utama yang perlu dilaporkan

  • Perubahan utama adalah ukuran area gate: dermaga lurus saat ini dengan 8 gate akan diganti dermaga berbentuk Y yang jauh lebih panjang dengan 18 gate.
  • Penumpang sekarang memakai walkway menuju gate, tetapi setelah redevelopment sky train akan melintasi batang dermaga berbentuk Y.
  • Toko akan ditambahkan di tempat sisi keberangkatan terminal bersambung dengan dermaga; saat ini tidak ada toko sama sekali.
  • Di sisi keberangkatan, security dan passport control serta area check-in tetap, bag drop akan ditambahkan, dan kafe akan dipindahkan dari dekat security ke samping pintu keluar keberangkatan.
  • Sisi kedatangan, yang sekarang hanya punya passport control dan bea cukai, akan mendapat kafe dan ATM, serta bangunan akan diperpanjang di satu sudut untuk menyediakan meja car hire.
  • Karena denah kedua menunjukkan masa depan, perubahan harus dijelaskan dengan bentuk masa depan seperti will be added atau is going to be replaced.

Contoh overview

Secara keseluruhan, bandara akan diperluas jauh dan lebih lengkap, dengan perubahan paling mencolok berupa area gate jauh lebih besar berbentuk Y yang dilayani sky train. Selain itu, sisi keberangkatan dan kedatangan terminal akan mendapat fasilitas penumpang baru, dengan aula kedatangan yang berubah paling banyak.

Rencana paragraf

  1. 1

    Pendahuluan (Introduction)

    Parafrasekan soal: denah membandingkan tata letak Southwest Airport saat ini dengan tata letak yang direncanakan setelah redevelopment tahun depan.

  2. 2

    Ikhtisar (Overview)

    Sebutkan dua poin utama tanpa rincian: area gate akan diperbesar dan didesain ulang, serta lebih banyak fasilitas akan disediakan di terminal, terutama di sisi kedatangan.

  3. 3

    Paragraf isi 1: gates and access

    Gambarkan perubahan dari dermaga pendek dengan 8 gate dan walkway menjadi dermaga berbentuk Y dengan 18 gate dan sky train, serta sebutkan toko baru di pintu masuk dermaga.

  4. 4

    Paragraf isi 2: the terminal building

    Jelaskan apa yang tetap (security dan passport control, check-in, passport control dan bea cukai) dan apa yang berubah: bag drop baru dan kafe yang dipindah di keberangkatan, serta kafe, ATM, dan meja car hire di perpanjangan sisi kedatangan.

Perbandingan yang berguna

  • Bandingkan area gate: 8 gate di dermaga lurus sekarang versus 18 gate di dermaga berbentuk Y di masa depan.
  • Bandingkan akses ke gate: walkway sekarang versus sky train setelah redevelopment.
  • Bandingkan dua bagian terminal: keberangkatan mendapat tambahan sederhana, sementara kedatangan berubah dari tanpa fasilitas menjadi memiliki tiga fasilitas.
  • Kelompokkan fitur yang tidak berubah: pembagian keberangkatan dan kedatangan, security dan passport control, passport control dan bea cukai, serta area check-in.
  • Sebutkan satu-satunya perubahan garis luar terminal: perpanjangan di sudut aula kedatangan untuk car hire.
  • Pakai bahasa lokasi: at the entrance to the pier, beside the departure exits, in the corner of the arrivals hall, along the stem of the pier.

Jawaban contoh Band 8+

210 kata · Jawaban contoh orisinal yang ditulis untuk ieltswrites, bukan jawaban resmi. Jawaban tetap dalam bahasa Inggris, seperti di ujian.

The plans compare the present layout of Southwest Airport with how it will look once it has been redeveloped next year.

Overall, the airport is set to be considerably expanded and better equipped. The most striking change will be a far larger, Y-shaped gate area served by a sky train, while the terminal building will gain a range of new passenger facilities, particularly on the arrivals side.

At present, passengers reach eight gates along a short, straight pier by means of a walkway. After the redevelopment, this pier will be replaced by a much longer Y-shaped structure containing 18 gates, more than double the current number, and a sky train will run along its central section. In addition, shops will be built at the entrance to the pier.

The terminal itself will keep its basic division into departures and arrivals. On the departures side, security, passport control and check-in will remain, but a bag drop will be introduced, and the café will be relocated from near security to beside the departure exits. The arrivals hall, which currently contains nothing beyond passport control and customs, will be transformed: a café and an ATM will be added, and the building will be extended at one corner to accommodate a car hire office.

Mengapa jawaban ini mendapat skor tinggi

Pencapaian Tugas (Task Achievement)
Jawaban memilih perubahan utama, termasuk jumlah gate, sky train, dan fasilitas baru di kedua sisi, menyatakan jelas apa yang tetap sama, serta memberi overview tentang perluasan dan peningkatan fasilitas.
Koherensi dan Kohesi (Coherence and Cohesion)
Informasi diatur menurut area, dulu gate lalu terminal, dan frasa lokasi dengan penghubung seperti meanwhile, in contrast, dan by far memandu pembaca secara logis.
Kosakata (Lexical Resource)
Kosakata peta seperti pier, Y-shaped, relocated, extended, dan replaced by dipakai tepat, dan fasilitas bandara dinamai dengan presisi.
Rentang dan Akurasi Tata Bahasa (Grammatical Range and Accuracy)
Bentuk pasif masa depan seperti will be replaced dan is set to gain digabungkan dengan present tense untuk tata letak saat ini, klausa relatif, dan komparatif, tanpa kesalahan.

Kosakata berguna

redevelopment
proses membangun ulang atau memperbaiki lokasi yang sudah ada
terminal building
bangunan bandara utama tempat penumpang check-in dan tiba
pier
bagian panjang bangunan bandara yang menuju boarding gates
Y-shaped
berbentuk huruf Y, dengan dua lengan bercabang dari satu batang
boarding gates
titik tempat penumpang naik pesawat
sky train
kereta otomatis yang mengangkut penumpang antar bagian bandara
be replaced by
dihapus dan diganti dengan sesuatu yang lain
be relocated
dipindahkan ke posisi lain
bag drop
meja tempat penumpang menyerahkan bagasi untuk dimuat ke pesawat
car hire
layanan yang menyewakan mobil kepada pelancong
be extended
diperbesar dengan menambah bagian baru
remain unchanged
tetap sama seperti sebelumnya
more than double
naik menjadi lebih dari dua kali jumlah semula, misalnya dari 8 menjadi 18

Kesalahan umum

  • Memakai past tense untuk menjelaskan perubahan, padahal redevelopment terjadi tahun depan dan membutuhkan bentuk masa depan.
  • Salah menghitung gate: sekarang 8, setelah redevelopment 18.
  • Melupakan fitur yang tetap sama, yang membantu pembaca memahami perbandingan.
  • Melewatkan perubahan kecil tapi penting seperti toko baru, kafe yang dipindah, atau perpanjangan untuk car hire.
  • Menjelaskan lokasi fasilitas secara samar, misalnya kafe ditambahkan di suatu tempat, tanpa menyebut sisi terminal mana.
  • Tidak menulis overview, atau overview yang hanya mencantumkan fasilitas baru tanpa menyatakan bandara akan diperluas.

Pertanyaan yang sering diajukan

Soal ini dari buku Cambridge yang mana?
Peta Southwest Airport saat ini dan setelah redevelopment ini adalah Writing Task 1 dari Test 3 dalam Cambridge IELTS 16 Academic, terbit 2021.
Tense apa yang harus kamu pakai untuk peta ini?
Pakai present simple untuk tata letak saat ini dan bentuk masa depan, sering pasif seperti will be added atau will be replaced, untuk perubahan yang direncanakan tahun depan.
Apakah kamu harus menyebut nomor setiap gate?
Tidak. Laporkan jumlah gate total sekarang dan di masa depan, 8 dan 18, alih-alih posisi tiap gate.
Berapa kata yang harus kamu tulis?
Tulis minimal 150 kata; kira-kira 170-200 kata cukup untuk menutup perubahan utama dan overview.

Gratis dan dengan batas waktu, lengkap dengan penghitung kata langsung, seperti ujian berbasis komputer. Setelah itu, dapatkan skor band dari AI.

Buka di komputermu

Simulator ujian membutuhkan layar laptop atau desktop. Kirim tautan ini ke dirimu sendiri dan buka di sana.

Soal serupa

Lihat semua: Soal IELTS Writing Task 1 Peta dan Contoh Jawaban

Lainnya dari Cambridge IELTS 16

Panduan IELTS Writing

Soal ujian © Cambridge University Press & Assessment, direproduksi untuk keperluan belajar dan ulasan. Analisis dan jawaban contoh bersifat orisinal. ieltswrites independen dan tidak berafiliasi dengan IELTS, British Council, IDP, maupun Cambridge University Press & Assessment.