Banco de questões

ieltswrites

Cambridge IELTS 19 Test 2 Writing Task 1: Mapas do porto de Porth

Cambridge IELTS 19 · Test 2 · Academic Writing Task 1Mapa / planta

Dois mapas comparam a configuração do porto de Porth em 2000 com a atual. Eles mostram a estrada principal, estacionamentos, banheiros, marina, área dos barcos de pesca, cais de balsas, estação de salvamento, praias e o edifício no promontório a leste.

A questão

You should spend about 20 minutes on this task. The plans below show a harbour in 2000 and how it looks today. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

Gráfico do Cambridge IELTS 19 Test 2 Writing Task 1: Dois mapas comparam a configuração do porto de Porth em 2000 com a atual. Eles mostram a estrada principal, estacionamentos, banheiros, marina, área dos barcos de pesca, cais de balsas, estação de salvamento, praias e o edifício no promontório a leste.

Grátis e com tempo marcado, com contador de palavras em tempo real, como na prova feita no computador. Depois, receba uma nota band da IA.

Abra no seu computador

O simulador do exame precisa de uma tela de notebook ou desktop. Envie este link para você mesmo e abra por lá.

Características principais a relatar

  • A mudança geral é de um porto de trabalho para um espaço mais voltado ao turismo: o castelo desativado foi transformado em hotel, cafés e lojas foram acrescentados e a praia ao sul deixou de ser pública.
  • As instalações para balsas foram ampliadas: havia um cais em 2000 e agora há dois, com o novo a oeste do primeiro, permitindo a atracação simultânea de mais balsas de passageiros.
  • A marina e a área de barcos de pesca trocaram de lugar: os iates particulares ficavam na bacia menor ao norte em 2000, mas agora usam a bacia maior ao sul, enquanto os barcos de pesca foram para o norte.
  • O castelo desativado no promontório a leste deu lugar a um hotel, a praia pública ao sul tornou-se praia privativa do hotel e a estrada foi prolongada até ele.
  • Uma fileira de cafés e lojas foi construída no cais ao lado da estação de salvamento, e um segundo bloco de chuveiros e banheiros foi acrescentado entre os dois estacionamentos.
  • Alguns elementos permaneceram iguais: a estrada principal, os dois estacionamentos no lado oeste, a estação de salvamento e a praia pública no nordeste.

Overview de exemplo

Em geral, o porto foi reurbanizado com maior foco em turismo e lazer, sobretudo pela transformação do castelo desativado em hotel e pela adição de cafés, lojas e outras instalações. O cais de balsas também foi ampliado, e a marina e a área de barcos de pesca trocaram de lugar.

Plano de parágrafos

  1. 1

    Introdução

    Parafraseie a tarefa: os mapas mostram como o porto de Porth mudou entre 2000 e o presente.

  2. 2

    Visão geral (overview)

    Apresente as principais mudanças sem detalhes: o porto passou a ser mais voltado ao turismo, o castelo foi transformado em hotel e novas instalações foram acrescentadas, o cais foi ampliado e a marina e a área de pesca trocaram de lugar. Mencione que o traçado da estrada e os estacionamentos permaneceram praticamente iguais.

  3. 3

    Desenvolvimento 1: água e embarcações

    Descreva o segundo cais, construído a oeste do primeiro para permitir a atracação de mais balsas, e a troca de lugar entre a marina, que passou da bacia norte para a maior ao sul, e os barcos de pesca, que foram para o norte.

  4. 4

    Desenvolvimento 2: terra e edifícios

    Descreva o hotel que substituiu o castelo desativado, a transformação da praia pública ao sul em praia privativa do hotel, o prolongamento da estrada, os cafés e lojas ao lado da estação de salvamento e os chuveiros e banheiros adicionais. Termine com o que permaneceu igual.

Comparações úteis

  • Divida as mudanças por área: na água, o cais, a marina e os barcos de pesca; em terra, o hotel, a praia, os cafés, os banheiros e a estrada.
  • Compare o uso público e privado: a praia ao sul era pública em 2000, mas agora pertence ao hotel, e os iates particulares passaram a ter mais espaço que os barcos de pesca.
  • Apresente a reurbanização como uma transição de porto de trabalho para centro de lazer e turismo.
  • Use expressões de substituição para o castelo e a praia e de mudança de lugar para a marina e os barcos de pesca.
  • Agrupe as adições: um segundo cais, um segundo bloco de banheiros, uma fileira de cafés e lojas e uma via de acesso ao hotel.
  • Mencione brevemente os elementos inalterados para ajudar o leitor a entender a dimensão da reurbanização.

Resposta-modelo Band 8+

208 palavras · Uma resposta-modelo original escrita para o ieltswrites, não uma resposta oficial. Ela fica em inglês, como na prova.

The two maps illustrate how Porth Harbour has changed between 2000 and the present day.

Overall, the harbour has been redeveloped with a stronger focus on tourism and leisure, most notably through the replacement of the castle with a hotel. The ferry facilities have also been expanded, while the areas for private yachts and fishing boats have swapped places.

On the water, the single dock that existed in 2000 has been joined by a second one to its west, so more passenger ferries can berth at once. In 2000, private yachts were moored in the small northern basin and fishing boats in the larger one to the south, but today the marina occupies the southern basin and the fishing fleet has been relocated to the north.

On land, the disused castle on the eastern headland has been replaced by a hotel. The public beach to its south has become a private beach for hotel guests, and the road has been extended to reach the hotel. A row of cafés and shops has also been built beside the lifeboat station, and a second block of showers and toilets has been added between the two car parks. However, the main road, car parks, lifeboat station and northern beach remain unchanged.

Por que esta resposta tem nota alta

Cumprimento da tarefa (Task Achievement)
A resposta apresenta uma visão geral (overview) clara da mudança para o turismo e das principais alterações estruturais; depois, cobre corretamente cada mudança importante, incluindo o cais, a troca das áreas de embarcações, o hotel e a praia privativa, e indica o que permaneceu igual.
Coerência e coesão (Coherence and Cohesion)
As mudanças são organizadas por área, primeiro na água e depois em terra; expressões de localização como to the west of, on the headland e beside the lifeboat station orientam o leitor pelos mapas.
Recursos lexicais (Lexical Resource)
Vocabulário preciso para mapas, como converted into, swapped places, berth, waterfront, headland e amenities, é usado de modo natural e correto.
Variedade e precisão gramatical (Grammatical Range and Accuracy)
O present perfect na voz passiva descreve as mudanças e o past simple descreve a situação em 2000; orações relativas e expressões participiais acrescentam detalhes sem erros.

Vocabulário útil

redevelop
transformar uma área construindo novos elementos ou mudando seu uso
be converted into
ser transformado para um uso diferente
be replaced by
ser substituído por um novo elemento
swap places with
ocupar o antigo lugar um do outro
be relocated to
ser transferido para outro lugar
an additional dock
segundo cais construído ao lado do existente
berth
local onde uma embarcação pode parar e ficar amarrada; também significa atracar
moored
amarrado e mantido em um lugar na água
waterfront
parte de uma cidade junto ao mar ou porto
headland
faixa estreita de terra que avança sobre o mar
amenities
instalações que tornam um lugar agradável ou útil, como banheiros, cafés e lojas
tourist-oriented
projetado principalmente para atrair e atender visitantes
remain intact
permanecer como antes, sem alteração ou remoção

Erros comuns

  • Descrever os mapas apenas no presente; mudanças de 2000 até hoje exigem estruturas passivas no present perfect, como has been replaced e has been built.
  • Omitir a troca de lugar entre a marina e a área de barcos de pesca, fácil de ignorar porque os dois rótulos ainda aparecem no mapa.
  • Não perceber que a praia ao sul passou de pública a privativa ou confundi-la com a praia pública ao norte, que não mudou.
  • Dizer que o castelo foi demolido e o hotel construído em outro lugar, quando o hotel fica no mesmo local, no promontório.
  • Listar cada elemento sem apresentar uma visão geral (overview) da reurbanização.
  • Acrescentar opiniões não mostradas nos mapas, como the harbour is now better for tourists.

Perguntas frequentes

De qual livro Cambridge é esta questão?
Estes mapas do porto de Porth em 2000 e no presente são a Writing Task 1 do Test 2 de Cambridge IELTS 19 Academic, publicado em 2023.
Que tempo verbal devo usar para estes mapas?
Use past simple para o porto em 2000 e present perfect, muitas vezes na voz passiva, para as mudanças até o presente; por exemplo, a second dock has been built. O present simple é adequado para o que continua igual hoje.
Preciso descrever todas as mudanças?
Descreva todas as mudanças importantes, pois não são muitas, mas agrupe-as de forma lógica e não gaste palavras com detalhes pequenos, como o formato exato da estrada.
Quantas palavras devo escrever nesta Task 1?
Escreva pelo menos 150 palavras; cerca de 170 a 200 são suficientes para apresentar uma visão geral (overview) e cada mudança principal em aproximadamente 20 minutos.

Grátis e com tempo marcado, com contador de palavras em tempo real, como na prova feita no computador. Depois, receba uma nota band da IA.

Abra no seu computador

O simulador do exame precisa de uma tela de notebook ou desktop. Envie este link para você mesmo e abra por lá.

Questões semelhantes

Ver tudo: IELTS Writing Task 1 Mapa: questões com respostas modelo

Mais do Cambridge IELTS 19

Guias de IELTS Writing

Questões de prova © Cambridge University Press & Assessment, reproduzidas para estudo e comentário. As análises e as respostas-modelo são originais. O ieltswrites é independente e não é afiliado ao IELTS, ao British Council, à IDP nem à Cambridge University Press & Assessment.