Banco de questões

ieltswrites

Cambridge IELTS 14 Test 3 Writing Task 1: Energia hidrelétrica

Cambridge IELTS 14 · Test 3 · Academic Writing Task 1Diagrama de processo

O diagrama mostra como uma usina hidrelétrica gera eletricidade. Ele compara o funcionamento durante o dia, quando a água desce para movimentar as turbinas, e à noite, quando as mesmas turbinas bombeiam a água de volta para um reservatório elevado.

A questão

You should spend about 20 minutes on this task. The diagram below shows how electricity is generated in a hydroelectric power station. Summarise the information by selecting and reporting the main features and make comparisons where relevant. Write at least 150 words.

Gráfico do Cambridge IELTS 14 Test 3 Writing Task 1: O diagrama mostra como uma usina hidrelétrica gera eletricidade. Ele compara o funcionamento durante o dia, quando a água desce para movimentar as turbinas, e à noite, quando as mesmas turbinas bombeiam a água de volta para um reservatório elevado.

Grátis e com tempo marcado, com contador de palavras em tempo real, como na prova feita no computador. Depois, receba uma nota band da IA.

Abra no seu computador

O simulador do exame precisa de uma tela de notebook ou desktop. Envie este link para você mesmo e abra por lá.

Características principais a relatar

  • O processo é um ciclo com dois modos: geração durante o dia e bombeamento à noite. Por isso, a resposta deve descrever ambos e a transição entre eles.
  • A água de um rio fica armazenada em um reservatório elevado atrás de uma barragem; a tomada de água na base da barragem fica aberta durante o dia e fechada à noite.
  • Durante o dia, a água desce por uma tubulação até a usina, onde turbinas reversíveis acionam um gerador; a eletricidade segue por linhas de transmissão até a rede elétrica nacional.
  • Depois de passar pelas turbinas durante o dia, a água flui para o reservatório inferior.
  • À noite, o fluxo se inverte: a água é retirada do reservatório inferior e as turbinas reversíveis a bombeiam pela tubulação de volta ao reservatório elevado.
  • Os principais componentes são a barragem, os reservatórios elevado e inferior, a tomada de água, a tubulação, a usina, as turbinas reversíveis, o gerador, as linhas de transmissão e a rede elétrica nacional; use esses termos corretamente.

Overview de exemplo

Em geral, a usina funciona como um ciclo reversível entre dois reservatórios em alturas diferentes. Durante o dia, a água desce e movimenta turbinas que geram eletricidade; à noite, as mesmas turbinas bombeiam a água de volta para que possa ser reutilizada.

Plano de parágrafos

  1. 1

    Introdução

    Reformule o enunciado: o diagrama mostra como uma usina hidrelétrica gera eletricidade e como funciona de modo diferente durante o dia e à noite.

  2. 2

    Visão geral (overview)

    Resuma o processo como um ciclo entre dois reservatórios: a água gera eletricidade ao descer durante o dia e é bombeada de volta à noite.

  3. 3

    Desenvolvimento 1: geração durante o dia

    Descreva as etapas em ordem: a água do rio se acumula no reservatório elevado atrás da barragem, a tomada se abre, a água desce pela tubulação até a usina, as turbinas reversíveis acionam o gerador, a eletricidade segue pelas linhas de transmissão até a rede nacional e a água flui para o reservatório inferior.

  4. 4

    Desenvolvimento 2: bombeamento à noite

    Explique que a tomada de água fica fechada e o fluxo se inverte: a água vai do reservatório inferior à usina, e as turbinas funcionam como bombas, levando-a de volta ao reservatório elevado para o dia seguinte.

Comparações úteis

  • Organize o desenvolvimento por período: um parágrafo para a geração durante o dia e outro para o bombeamento à noite.
  • Compare as duas funções das turbinas reversíveis: acionar o gerador durante o dia e bombear água para o reservatório elevado à noite.
  • Compare a posição da tomada de água: aberta durante o dia e fechada à noite.
  • Acompanhe a direção da água: ela desce do reservatório elevado ao inferior durante o dia e sobe no sentido inverso à noite.
  • Acompanhe também a eletricidade: do gerador, pelas linhas de transmissão, até a rede nacional.
  • Destaque o caráter cíclico do processo na visão geral e na última frase, pois a água é reutilizada diariamente.

Resposta-modelo Band 8+

210 palavras · Uma resposta-modelo original escrita para o ieltswrites, não uma resposta oficial. Ela fica em inglês, como na prova.

The diagram illustrates how electricity is produced in a hydroelectric power station and how the system operates differently during the day and at night.

Overall, the station works as a reversible cycle involving two reservoirs at different heights. During the day, water flows downhill to drive turbines that generate electricity, whereas at night the same turbines pump the water back uphill so that it can be reused.

The process begins with water from a river collecting in a high-level reservoir, where it is held back by a dam. In the daytime, the intake at the foot of the dam is open, so water is channelled down a sloping pipe to the power station. There it passes through reversible turbines, which operate a generator, and the electricity produced is carried along power lines to the national grid. Having passed through the turbines, the water then flows on into a low-level reservoir.

At night, the intake is closed and the direction of flow is reversed. Water is drawn from the low-level reservoir back into the power station, where the turbines now act as pumps, forcing it up the same pipe into the high-level reservoir. As a result, the water is stored at height once again, ready to generate electricity the following day.

Por que esta resposta tem nota alta

Cumprimento da tarefa (Task Achievement)
A resposta cobre todas as etapas dos dois modos, apresenta uma visão geral clara do ciclo em dois sentidos e destaca a dupla função das turbinas reversíveis sem acrescentar informações externas.
Coerência e coesão (Coherence and Cohesion)
A divisão do desenvolvimento em parágrafos sobre o dia e a noite reflete o diagrama; marcadores como begins with, there, then e as a result esclarecem a sequência.
Repertório lexical (Lexical Resource)
Os rótulos são reformulados e ampliados com vocabulário preciso de processos, como held back, channelled, drive, reversed e act as pumps, evitando cópia mecânica.
Variedade e precisão gramatical (Grammatical Range and Accuracy)
Estruturas passivas no presente descrevem o processo com precisão e são combinadas com verbos ativos, orações relativas e orações de finalidade como so that it can be reused.

Vocabulário útil

hydroelectric power station
instalação que usa água em movimento para gerar eletricidade
reservoir
grande lago natural ou artificial usado para armazenar água
dam
estrutura construída em um rio para reter água
intake
abertura pela qual a água entra na tubulação a partir do reservatório
reversible turbines
turbinas que giram nos dois sentidos, gerando energia ou bombeando água
generator
máquina que transforma movimento em eletricidade
the national grid
rede de linhas de transmissão que distribui eletricidade por um país
be channelled
ser direcionado por uma tubulação ou passagem
drive the turbines
fazer as turbinas girarem
the flow is reversed
o fluxo da água passa a se mover no sentido contrário
be pumped back up
ser bombeado de volta para um nível mais alto
cyclical process
sequência de etapas que se repete continuamente
subsequently
em seguida; usado para indicar a próxima etapa
whereupon
logo após; expressão de sequência usada na escrita

Erros comuns

  • Descrever apenas a etapa diurna e omitir o bombeamento noturno, que representa metade do processo.
  • Usar apenas verbos na voz ativa em vez de estruturas passivas como is stored, is channelled e is pumped, mais naturais para descrever um processo.
  • Acrescentar informações ausentes do diagrama, como o funcionamento interno das turbinas ou os benefícios ambientais da energia hidrelétrica.
  • Omitir a visão geral ou apenas listar etapas nela, sem resumir o ciclo diurno e noturno.
  • Confundir os reservatórios, por exemplo, dizendo que a água é bombeada para o reservatório inferior à noite.
  • Copiar literalmente rótulos inteiros, como Night: pump water into high-level reservoir, em vez de incorporá-los a frases gramaticais.

Perguntas frequentes

De qual livro Cambridge é esta questão?
Este diagrama de uma usina hidrelétrica é a questão de Writing Task 1 do Test 3 de Cambridge IELTS 14 Academic, publicado em 2019.
Devo usar a voz passiva para este processo?
Use a passiva quando a ação for mais importante que quem a realiza, como em water is stored e is pumped back. Para variar, combine-a com verbos ativos, como em the turbines operate the generator.
Como organizar um diagrama de processo com etapas diurnas e noturnas?
Depois da introdução e da visão geral, escreva um parágrafo sobre a geração durante o dia e outro sobre o bombeamento à noite, acompanhando a direção da água em cada um.
Quantas palavras devo escrever nesta Task 1?
Escreva pelo menos 150 palavras; cerca de 170 a 200 são suficientes para descrever cada etapa com clareza sem acrescentar informações não mostradas.

Grátis e com tempo marcado, com contador de palavras em tempo real, como na prova feita no computador. Depois, receba uma nota band da IA.

Abra no seu computador

O simulador do exame precisa de uma tela de notebook ou desktop. Envie este link para você mesmo e abra por lá.

Questões semelhantes

Ver tudo: IELTS Writing Task 1 Diagrama de processo: questões com respostas modelo

Mais do Cambridge IELTS 14

Guias de IELTS Writing

Questões de prova © Cambridge University Press & Assessment, reproduzidas para estudo e comentário. As análises e as respostas-modelo são originais. O ieltswrites é independente e não é afiliado ao IELTS, ao British Council, à IDP nem à Cambridge University Press & Assessment.